S&C Featured Solution: Renewable Energy Integration

A solar energy services provider recently sought to develop a 20-MW solar photovoltaic (PV) project in Southern California and connect it to the grid. However, connecting the project required satisfying two power purchase agreements with separate interconnecting utilities and all the requirements of the California ISO.

Read this new case study to learn how S&C was able to accomplish these tasks while providing the engineering, procurement, and construction support for the solar-generation plant’s collection-point substation and local-utility interconnection point.

Download the case study